• last updated 10 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
- do not depend on beta or development versions

- make sure that released versions are not beta or development

- align version numbers (e.g. use also 5.9.1 for xotcl-core)

- bump version numbers to 5.9.1

  1. … 83 more files in changeset.
bump version numbers to 5.9.1b9 respectively to 2.9.1b9 to prepare for release

  1. … 91 more files in changeset.
Improve translation for the full version of this portlet: was same as the lesser one and therefore confusing. (thanks to Markus Moser)

    • -1
    • +1
    ./catalog/calendar-portlet.de_DE.ISO-8859-1.xml
- bump version number of OpenACS to 5.9.1b3 and DotLRN to 2.9.1b3

  1. … 79 more files in changeset.
Improve robustness and provide better debugging info in error cases

Bump version numbers for OpenACS 5.9.1b1

  1. … 81 more files in changeset.
Don't allow negative duration periods

Fix error message returned for invalid dates

- fix potental bug, when the HTML form sends an empty form field "period_days" via POST method

- make boolean tests in .adp files more uniform

  1. … 12 more files in changeset.
- bump version numbers to 6.9.0 (oacs) / 2.9.0 (dotlrn)

  1. … 72 more files in changeset.
- bump version numbers

  1. … 75 more files in changeset.
*** empty log message ***

  1. … 75 more files in changeset.
- add editor hints to keep spaces/tabs in the future more consistent

    • -1
    • +7
    ./tcl/calendar-admin-portlet-procs.tcl
    • -1
    • +7
    ./tcl/calendar-portlet-display-procs.tcl
  1. … 302 more files in changeset.
- standardize argument passing to adp-includes, don't perform double i18n and double quoting

  1. … 122 more files in changeset.
- quote HTML attributes

Merging back to HEAD branch oacs-5-8 (using tag vg-merge-oacs-5-8-from-20141027).

    • -94
    • +122
    ./sql/postgresql/calendar-admin-portlet-create.sql
    • -37
    • +51
    ./sql/postgresql/calendar-portlet-drop.sql
  1. … 2536 more files in changeset.
- bump version numbers to 5.8.1

  1. … 74 more files in changeset.
- bump version number to 5.8.1b2

  1. … 75 more files in changeset.
- bump version numbers for beta release

  1. … 74 more files in changeset.
- bump version numbers to [25].8.1a3

- update requirements for core components to newest version number in the branch

  1. … 74 more files in changeset.
- added summary line

- regenerated .info files

  1. … 9 more files in changeset.
- set maturity to DotLRN packages to 2

  1. … 23 more files in changeset.
- use dotlrn.org as vendor

  1. … 23 more files in changeset.
- modernize SQL (dollar quoting)

    • -95
    • +123
    ./sql/postgresql/calendar-admin-portlet-create.sql
    • -37
    • +51
    ./sql/postgresql/calendar-portlet-drop.sql
  1. … 4 more files in changeset.
- improve page contracts (use right type page_nums)

- modernize Tcl (use byte-compiled comparisons, don't use numeric comparisons for string expressions, brace expressions)

  1. … 2 more files in changeset.
- correct work-in-progress version numbering to *a1

  1. … 28 more files in changeset.
- bump version numbers due to branching

  1. … 28 more files in changeset.
- bump version numbers

  1. … 28 more files in changeset.