ecommerce-technical.adp

  • last updated 14 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
revising documentation by removing or updating historical comments

  1. … 5 more files in changeset.
committing changes, improvements and fixes to assessment, assessment-portlet, dotlrn, dotlrn-assessment, dotlrn-catalog, dotlrn-evaluation, ecommerce, evaluation and evaluation-portlet

  1. … 913 more files in changeset.
updating parameter description and defaults to match installation documentation standards

  1. … 2 more files in changeset.
commit to HEAD of merge of changes on oacs-5-1 branch between tags jcd-merge-5-1-20050111 and jcd-merge-5-1-20050224

  1. … 321 more files in changeset.
removed previously escaped quotes, clarified other statements

added technical info about how images are handled

fixing oversight typos from earlier today

updating links, grammar, clarifications

Fix for docs ..

  1. … 23 more files in changeset.
noquote changes (Dirk Gomez)

  1. … 127 more files in changeset.
1) Updated documentation .adp files to reflect the new site wide master template.

2) Removed last calls to ec_footer from ecommerce.

3) Removed references to the non existing ecommerce parameter EcommercePath

  1. … 18 more files in changeset.
The useless address confimation pages have been removied thanks to rp_internal_redirect.

  1. … 30 more files in changeset.

Major overhaul:

- Replaced CyberCash with Payment Service Contract interface.

- Added Shipping Service Contract.

- Many(!) bug fixes.

- Added soft good (goods that don't require shipping) handling capacity.

- And more..

  1. … 275 more files in changeset.

Forgot to define binary files before importing, so .gifs were messed up.

  1. … 2479 more files in changeset.
Initial revision

    • -0
    • +638
    ./ecommerce-technical.adp
  1. … 2479 more files in changeset.