• last updated 1 hour ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
improve tailorability by separating name of event and time span

  1. … 4 more files in changeset.
whitespace cleanup

  1. … 3 more files in changeset.
Use ad_include_contract instead of implicit variable guessing

  1. … 3 more files in changeset.
merged changes from the oacs-5-9 branch and resolved conflicts

  1. … 7834 more files in changeset.
- standardize url construction

  1. … 2 more files in changeset.
Merging back to HEAD branch oacs-5-8 (using tag vg-merge-oacs-5-8-from-20141027).

  1. … 2547 more files in changeset.
Merged oacs-5-5 branch of .LRN packages to HEAD.

  1. … 87 more files in changeset.
1. Merge 2.4.1 to HEAD other than assessment, imsld, lorsm, and views.

2. Bump version numbers to 2.5.0d1.

  1. … 379 more files in changeset.
Removed .LRN dependencies from calendar (essentially the view include

scripts only worked from within .LRN or calendar itself). Did a bunch of

clean-up of stuff being computed by portlets that are totally ignored by the

calendar include scripts. If the semantics are wanted, they should be put

into the calendar package itself. Switched a bunch of stuff to properly use

export_vars, and to generate links inline rather than subst an awkward

template. Got rid of the use of site_node_object_map in calendar, because

calendars have a perfectly usable package_id in the data model (should really

be rewritten to use package_id in the underlying acs_objects row), and the

URLs generated by site_node_object_map are just as easily generated from this

package id. Bonus: site nodes are cached, the site_node_object_map is not.

  1. … 48 more files in changeset.
Merged the 5.4 branch to HEAD, to pick up emmanuelle's fixes before I go

off fixing a bunch of other stuff.

  1. … 27 more files in changeset.
PG 8.3 tightened up type checking, thus enforcing the notion that "to_date"

converts a string to a date, not a date to another form of a date (sheesh).

Moved that query into the pg xql file then discovered that apparently it's

not a good query for oracle, either, so hopefully fixed that (though it will

need testing)

  1. … 2 more files in changeset.
Merged oacs-5-3 branch to HEAD

  1. … 187 more files in changeset.
Merged changes to HEAD ...

  1. … 1556 more files in changeset.
Merge return_url and ui cleanup frm 5.2 (sorry! accidentally commited new code to 5.2 first)

  1. … 14 more files in changeset.
merge changes on oacs-5-1 branch to head, changes between jcd-merge-20040420 and jcd-merge-5-1-20040517 were merged, head pre changes is jcd-merge-pre-20040517 and post is jcd-merge-post-20040517

  1. … 834 more files in changeset.
merge of changes up to jcd-merge-for-dirk from oacs-5-1 to HEAD

  1. … 14 more files in changeset.
A few more CSS modifications

Slimmed down the CSS file considerably

Removed markup from the view pages

Unified multirow names

Unified sql queries

Use partialqueries more consistently

(These changes should be backwards-compatible with .LRN 2.0 and .LRN

head. Testing needs to be done here, fixing will take place during the

feature freeze period)

  1. … 10 more files in changeset.
Lumped all the different view-pages' query into one thus drastically slashing the amount of code that looks subtly different but effectively always retrieves calendar items for a particular interval.

  1. … 13 more files in changeset.
The date format string is constant - it is always the ANSI date format. There is no need to create a variable in TCL and then pass it on as a bind variable to the database. Instead I have hard-wired the format string into the database which means less code and maybe even slightly more efficiency.

  1. … 12 more files in changeset.
Fixed bug #952: quoting of calendar items

  1. … 6 more files in changeset.
Fixed bug #482: URLs for gifs wrong

  1. … 11 more files in changeset.
Make calendar play nice with calendar-portlets. I am slowly approaching alpha status with this.

  1. … 20 more files in changeset.
Renamed first_weekday_of_the_week_system to first_weekday_of_the_week_tz because Oracle does not approve of too long variable names, Moved calculation of weekday to SQL - impossible to calculate that in TCL

  1. … 1 more file in changeset.
Multiple i18n fixes

  1. … 10 more files in changeset.
Bring back url_stub_callback, day_template, item_template

  1. … 8 more files in changeset.
I18N work.

*** empty log message ***

  1. … 2 more files in changeset.
adding timezone support to the month/week/day/list view templates

  1. … 9 more files in changeset.
removed junk code

  1. … 4 more files in changeset.
noquote fixes: moved as much html generation into adp files

  1. … 42 more files in changeset.