• last updated 11 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
Bump version number to release new version. When toggling status of projects,

also toggles status of corresponding project manager project when

appropriate (behavior is the same if no project-manager is installed)

    • -0
    • +12
    ./www/admin/project-make-active.tcl
    • -0
    • +12
    ./www/admin/project-make-inactive.tcl
Merge all code over from HEAD. New development on logger can now procede from

the oacs-5-1 branch, instead of HEAD.

  1. … 7 more files in changeset.
Bump to version 1.05b6 to take into account project-manager API changes

introduced by Malte. Begins to add project status to /lib/entries.tcl

Now shows estimated hours work remaining when linked with project-manager.

Logger now sorts the Users filter by first name, last name, instead of

by user_id

Fixes bug when creating new task from project-manager.

Fix use of boolean type in entry::edit proc.

Added in ability to log against project-manager projects and tasks.

Untabify: entries-postgresql.xql (sorry won't do it again!)

Fixed scalability issue with one one function call per project being

shown. Added in a dependency on new categories proc, which has a new

proc that greatly speed up display of logger entries.

Italicize the current location in the navbar

Added in links to project-manager in the navbar, when project-manager

is integrated with that instance of logger.

optimized the variable::get_default_variable_id proc for postgres (much faster)

sped up the select_users query by using persons instead of cc_users

sped up entries select query by using persons instead of cc_users

  1. … 7 more files in changeset.
merge changes on oacs-5-1 branch to head, changes between jcd-merge-20040420 and jcd-merge-5-1-20040517 were merged, head pre changes is jcd-merge-pre-20040517 and post is jcd-merge-post-20040517

  1. … 830 more files in changeset.
Bumped logger up one version. I had added in an optional -party_id

switch in logger::entry::new, and project-manager depends on it, so I

need to ensure that project manager can depend on the newer API

option.

Changed standard-lars -> standard form template style

  1. … 10 more files in changeset.
Added in an optional party_id for logger::entry::new This can be useful

if you're bulk importing.

Added a return_url so it can be called by other packages directly (e.g. project-manager).

Typo: Added space

Fixed problem with accounting for daylight savings switches within the period

Cleaned up user experience, added user-messages in many places

    • -2
    • +5
    ./www/admin/map-variable-to-project-2.tcl
    • -3
    • +3
    ./www/admin/map-variable-to-project.tcl
Display message when no projects exist in this instance

merge of all changes on oacs-5-0 branch between tag openacs-5-0-0-final and jcd-merge-pre503 (except those in lars-blogger).

  1. … 292 more files in changeset.
Changed the fragile foreach to util_unlist

More rendering cleanup

Use new category-form-helper-procs

Fixed Bug #1481

Fixed bug: Only show entries from projects mapped to this package instace

Missing 'distinct' when prepopulating project lead drop-down with current project leads

Fixed bug: Logger index page included inactive projects

Fixed to work with new categories changesonly show 7 days log history

Fixed action-link

Fixed problem with start_date/end_date not being respected by list-buidler, because filter is named time_stamp

Fix test to use current api

- Speed improvements on query (taking permission checking out)

- Making projection bar bigger