• last updated 3 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
- updated version numbers, regenerated documentation

  1. … 298 more files in changeset.
- use templating for navigation in doc files

- add adp-files /packages/acs-core-docs/lib/navheader and

/packages/acs-core-docs/lib/navfooter

  1. … 215 more files in changeset.
file test-cases.adp was initially added on branch oacs-5-9.

- add .adp files for pretty documentation

  1. … 39 more files in changeset.
file requirements.adp was initially added on branch oacs-5-9.

  1. … 2 more files in changeset.
file index.adp was initially added on branch oacs-5-9.

  1. … 4 more files in changeset.
Added contributors.

Added link to test-cases.html

Added test-cases.html - basically the specs/requirements for automated tests

Added some paragraphs. Want them to be backed up.

Removed a lot of crap (this time by me)

Rmoved - it is either obvious nor not true anymore.

Removed Usability Test. No author given, it is not clear how this document is related to the OpenACS calendar, it has no date, and no version

Removed link to Regression Tests

The content for this doc is in images and they images do not existed => Removed

noquote fixes: moved as much html generation into adp files

  1. … 42 more files in changeset.
added calendar wish list and comment to the old docs that they are outdated

add index pages for packages with docs

  1. … 5 more files in changeset.
Usability Test

    • -0
    • +7899
    ./thesisUsabilityTest.htm
Regression Test

    • -0
    • +2858
    ./regressionTest.htm

Grabbed the incomplete (and never to be completed) calendar module from the

ArsDigita CVS tree.

  1. … 44 more files in changeset.
Initial revision

    • -0
    • +533
    ./requirements.html
  1. … 44 more files in changeset.