• last updated 2 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
A variety of changes that add up to making outlook synchronization work

with PostgreSQL (at all) and Oracle (better).

1. Changed calendar to read SystemTimezone rather than hardwire it to

US/Eastern.

2. Made calendar depend on acs-lang since that's where the param lives.

3. Fixed the query on the acs-lang page that lets you set the timezone

(used the Oracle-ism UNIQUE rather than the standard DISTINCT)

4. Saw that the test stuff doesn't work and got rid of the links on the

index page - people can live without testing it for this release (we

should fix it for 4.7)

5. Fixed timezone__local_to_utc so it works with calendar, though it's

very whacky (shifted so the timezone'd date part is the UTC date, would

be much much better to use timestamp without timezone but PG doesn't

accept that syntax for function returns and we're not ready to drop

PG 7.2 support yet so I can't take advantage of the timestamp/timestamptz

type names, sigh)

  1. … 6 more files in changeset.
Collaboraid: adding namespaces to the TCL API, adding new procedures for extracting keys from adp pages and parsing keys embedded in text, adding a translation web UI that was used at Greenpeace (at www/admin) and making it work with PostgreSQL, moving the old pages under www to be under www/admin/test, making the lang_messages table use locale rather than language, added upgrade scripts

  1. … 111 more files in changeset.

A bunch of "ACS"->"OpenACS" and similar changes

  1. … 28 more files in changeset.

Forgot to define binary files before importing, so .gifs were messed up.

  1. … 2479 more files in changeset.
Initial revision

  1. … 2479 more files in changeset.