• last updated 7 hours ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
moving simulation to /openacs-4/packages

  1. … 234 more files in changeset.
further work on the siminst wizard. Making sure the right tab is entered by default. Making the finish button only appear if all previous tabs are complete. Making the pretty state work.

  1. … 15 more files in changeset.
changing instanatiation wizard to indicate for each tab separately whether it's finished or not

  1. … 13 more files in changeset.
going over most of the TODO's in citybuild and siminst, removing some, fixing others

  1. … 25 more files in changeset.
mockup and TODO changes from walkthrough

  1. … 39 more files in changeset.
making the demo data setup script do a minimal end-to-end test by instantiating the tilburg template loaded from spec and then having Demo User 1 execute two tasks, send a message, and upload a document

  1. … 11 more files in changeset.
TODOs and mockup edits

  1. … 19 more files in changeset.
Make all tabs available all the time, when in dev_sim (almost - still need to refactor code)

  1. … 11 more files in changeset.
Making wizards work in casting mode

  1. … 15 more files in changeset.
Commit of latest siminst wizard stuff

  1. … 19 more files in changeset.
More wizard

  1. … 23 more files in changeset.
More wizard

  1. … 9 more files in changeset.
Started to add wizard to siminst

  1. … 21 more files in changeset.